The handover checklist, and the one test that proves it
· 4-minute read · Buying software · by Direct Softworks
Every supplier says the handover is complete. There is exactly one way to find out, it costs half a day, and almost nobody does it.

A handover is not a delivery of files. It is a transfer of the ability to continue without the person who built it, and those two are much further apart than they look.
We have watched companies receive a repository, a database dump and a friendly email, believe they were covered, and discover eighteen months later that nobody could deploy the thing.
The list
Source code, in a repository you own, with its history. Not a zip. The history is the record of why the system is the way it is, and it is the difference between the next developer understanding it in a week or in three months.
A README a stranger can follow. How to run it locally, how to deploy it, what every environment variable is for. The standard is literal: somebody who has never seen the project follows it and gets the system running without asking a question.
The database schema, and a tested restore. Not "here is a dump". A documented path from an empty machine to a working system, which somebody has actually walked.
Infrastructure in your accounts. Server, domain, DNS, certificates, mail sender, object storage. Ownership, not shared passwords. If any of it is on a supplier's account, it is not yours, and the transfer is a project rather than a click.
Credentials transferred and rotated. Every key the departing party knew should be changed on handover. This is not distrust, it is hygiene, and a good supplier suggests it before you do.
Third-party components listed with their licences. Specifically: is anything licensed to the supplier rather than to you, and does anything expire.
The decisions, written down. Every system has three or four places where the obvious approach was not taken. Undocumented, each one is a trap: the next developer "fixes" it and breaks something that was load-bearing.
Scheduled jobs, named. What runs nightly, what it does, and what happens if it does not run. Cron jobs are the most commonly undocumented part of any system and the most likely to fail silently.
Monitoring and alerts, pointing at you. If alerts go to the supplier's inbox, you find out about outages by being told.
A named recovery procedure for the boring disasters. The database is corrupted. The certificate expired. The disk is full. One page each.
The one test
Everything above can be present and the handover can still be fiction. There is exactly one way to know.
Have a developer who did not build it take the repository and the documentation and get the system running on a clean machine.
Half a day. Pay them for it. Do it while the original team is still reachable, because the point is not to catch anybody out, it is to find the gaps while they can still be filled cheaply.
In our experience this reveals something almost every time: a config file that was never committed, a manual database step somebody does by hand, a dependency on a service nobody mentioned, an environment variable that exists only in one person's shell. All in projects where everybody sincerely believed the handover was complete, because the person who built it cannot see what they know.
A supplier who resists this has told you something valuable for the price of asking.
Do it at the start, not at the end
The mistake is treating handover as a closing activity. By the end, the incentives are wrong on both sides: the project is over, the budget is spent, and everybody wants to move on.
Instead, make the handover artefacts a condition of the earlier milestones. The README exists when the first version deploys, because that is when it is written from experience rather than from memory. The infrastructure is in your accounts from day one, so there is nothing to migrate. Ownership transfers on final payment, which means it was agreed in the contract rather than negotiated at the end.
Done that way, the handover on the last day is a five minute conversation, because it already happened.
Why this matters more than the contract
You can have flawless paperwork and no ability to act. Ownership on paper and ownership in practice are different things, and only one of them helps you on the Monday your supplier stops answering.
The checklist above is really an answer to a single question, which is worth asking before you sign rather than after: if they disappeared on Friday, what would Monday look like? A system that survives its author is safe regardless of what happens to the author, and that property is built during the project or not at all.