Skip to content
Book a call

Writing a spec when you have never written one

· 4-minute read · Buying software · by Direct Softworks

You do not need a requirements document. You need to describe one day of work in your own words, and you already know everything it should contain.

Companies stall for months at this step. Not because it is hard, but because the word makes people think they have to produce a document in a language they do not speak, and they wait until they have time to do it properly.

You do not need that document. You need something better and much shorter, and you can write it this afternoon.

Describe the day, not the system

The most useful thing a supplier can receive is a plain description of how the work happens now.

An order arrives by email or by phone. Maria writes it in the orders sheet. If the customer is new she adds them to the customers sheet and asks for the CUI. She checks stock by opening the stock sheet, and if we do not have it she writes "de comandat" in the notes column. At the end of the day she prints the picking list for the warehouse. On Fridays she sends Ion the list of what was delivered so he can invoice it.

That paragraph contains more usable requirement than most formal specifications. It names the actors, the artefacts, the sequence, the exception, and it does it in the vocabulary your business actually uses, which is the vocabulary the software should use too.

Write one of those for each of the three or four processes you want the system to hold. That is your specification.

Then answer the questions the paragraph raises

A good supplier will come back with questions. You can save a round by anticipating the standard ones:

What happens when it goes wrong? Order cancelled after picking. Customer changes quantity. Wrong item delivered. The exceptions are where most of the complexity lives, and they are the part people leave out because they are not the normal case.

Who is allowed to do what? Can Maria change a price? Can the warehouse see margins? "Everyone sees everything" is a legitimate answer and a much cheaper one, but say it deliberately rather than by omission.

What must never happen? Dispatch without a delivery note. Two orders taking the same last item. Selling below cost without approval. These become the validation rules, and they are worth more than any feature list.

What do you need to know each month? The reports. Ask for the ones somebody currently builds by hand, because those are the ones that are actually used.

The single most valuable artefact you already have

Send the spreadsheet.

Not a description of it. The file, with real data in it, or a copy with names changed.

The columns your team added by hand over four years are a precise record of every question your previous tools could not answer. Nobody added a column for fun. Each one is a requirement, discovered under pressure, and it is more honest than anything anybody will write in a meeting, because nobody was performing for a stakeholder when they added it.

We treat the sheet as the specification rather than as background material, and it is consistently the fastest route to a first version that people recognise.

What not to do

Do not write screens. "There should be a dashboard with cards showing..." is a design, not a requirement, and it is the part you are paying somebody else to be good at. Describe what you need to know, not what it should look like.

Do not copy a competitor's feature list. You will get their compromises without their reasons.

Do not try to be complete. A specification that covers everything takes three months, and by the end the first half is out of date. Cover what happens most days, name the exceptions you know about, and accept that some will surface during the build. They always do, and a supplier who acts surprised by that has not done many of these.

Do not include the technology unless you have a real constraint. "It must run on our existing SQL Server" is a genuine requirement. "It should use React" is not a requirement, it is a preference about somebody else's toolbox.

How to tell if the spec is good enough

Two tests.

Hand it to a colleague who does not do that job. If they can describe the process back to you, it is clear. If they ask what a term means, define the term, because a supplier will have the same question and will guess rather than ask.

Check that it says what "done" means. Not "manage orders". Something a person could verify: Maria can enter an order in under a minute, the warehouse gets a picking list without anybody printing anything, and Ion can produce the month's invoices without opening a spreadsheet.

That sentence is what a fixed price is quoted against, and it is what protects both sides when there is a disagreement in week five. Vague scope is not a risk the supplier carries. It is a risk you both carry, and it gets settled by whoever is more stubborn.

More from the blog